User contributions for JamesCowan
Jump to navigation
Jump to search
- 13:28, 28 September 2023 diff hist −161 Smart Blue Roof - Project Overview (Summary) current
- 13:27, 28 September 2023 diff hist −161 Smart Blue Roof - Project Overview current
- 03:03, 28 September 2023 diff hist −3 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 03:03, 28 September 2023 diff hist −5 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 02:59, 28 September 2023 diff hist +48 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 02:53, 28 September 2023 diff hist +1 Smart Blue Roof - Project Overview →Station 4 – Basement Cistern and Treatment System
- 02:52, 28 September 2023 diff hist +12 Smart Blue Roof - Project Overview →Station 4 – Basement Cistern and Treatment System
- 02:51, 28 September 2023 diff hist −1 Smart Blue Roof - Project Overview →Station 4 – Basement Cistern and Treatment System
- 02:49, 28 September 2023 diff hist −266 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:47, 28 September 2023 diff hist −2 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:45, 28 September 2023 diff hist +1 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:45, 28 September 2023 diff hist −1 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:44, 28 September 2023 diff hist +3 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:42, 28 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:41, 28 September 2023 diff hist −15 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:29, 28 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Introduction
- 02:19, 28 September 2023 diff hist +130 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 02:19, 28 September 2023 diff hist +130 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:17, 28 September 2023 diff hist +39 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 02:08, 28 September 2023 diff hist 0 Smart Blue Roof - Project Overview (Summary) →Station 4 – Basement Cistern and Treatment System
- 02:08, 28 September 2023 diff hist 0 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 01:56, 28 September 2023 diff hist −3 Smart Blue Roof - Project Overview (Summary) →Station 4 – Basement Cistern and Treatment System
- 01:50, 28 September 2023 diff hist +2 Smart Blue Roof - Project Overview (Summary) →Station 1 – Roof Surface
- 19:57, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 4 – Basement Cistern and Treatment System
- 19:57, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 19:57, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 19:55, 27 September 2023 diff hist 0 N File:Rooftop-Treatment-System-v3.PNG current
- 19:51, 27 September 2023 diff hist 0 N File:Basement-Treatment-System-v2.PNG current
- 18:59, 27 September 2023 diff hist −15 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 18:57, 27 September 2023 diff hist +45 Smart Blue Roof - Project Overview (Summary)
- 18:56, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview (Summary)
- 18:55, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview
- 18:55, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview (Summary)
- 18:54, 27 September 2023 diff hist +88 Smart Blue Roof - Project Overview
- 18:54, 27 September 2023 diff hist +277 Smart Blue Roof - Project Overview (Summary)
- 15:56, 27 September 2023 diff hist −7 Smart Blue Roof - Project Overview (Summary) →Station 2 – Modulating Control Valves
- 15:55, 27 September 2023 diff hist −14 Smart Blue Roof - Project Overview (Summary)
- 15:54, 27 September 2023 diff hist +38 Smart Blue Roof - Project Overview (Summary)
- 15:52, 27 September 2023 diff hist +7 Smart Blue Roof - Project Overview (Summary) →Station 2 – Modulating Control Valves
- 15:45, 27 September 2023 diff hist +176 Smart Blue Roof - Project Overview (Summary) →Station 4 – Basement Cistern and Treatment System
- 15:45, 27 September 2023 diff hist +210 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 15:44, 27 September 2023 diff hist −11 Smart Blue Roof - Project Overview (Summary) →Station 2 – Modulating Control Valves
- 15:44, 27 September 2023 diff hist +262 Smart Blue Roof - Project Overview (Summary) →Station 2 – Modulating Control Valves
- 15:43, 27 September 2023 diff hist +21 Smart Blue Roof - Project Overview (Summary) →Contact Information
- 15:42, 27 September 2023 diff hist −3 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 15:42, 27 September 2023 diff hist +4 Smart Blue Roof - Project Overview (Summary) →Station 4 – Base Cistern and Treatment System
- 15:42, 27 September 2023 diff hist +4 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 15:39, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview (Summary) →Station 4 – Base Cistern and Treatment System
- 15:39, 27 September 2023 diff hist +5,839 N Smart Blue Roof - Project Overview (Summary) Created page with "=='''Introduction'''== Conventional flat roofs on industrial, commercial, and institutional buildings are designed to quickly remove rainwater from their surfaces. The passive control strategy of these conventional roof assemblies provides no opportunity for rainwater reuse and contributes to downstream erosion and the potential for flooding. Credit Valley Conservation’s Smart Blue Roof (SBR) flips this idea on its head and uses an active control strategy to capture ra..."
- 15:33, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 15:33, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 15:32, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 15:32, 27 September 2023 diff hist −2 Smart Blue Roof - Project Overview
- 15:30, 27 September 2023 diff hist −1 Smart Blue Roof - Project Overview →Station 2 – Modulating Control Valves
- 15:17, 27 September 2023 diff hist 0 N File:Rooftop-Treatment-System-v2.png current
- 15:10, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview
- 15:10, 27 September 2023 diff hist +401 Smart Blue Roof - Project Overview
- 15:05, 27 September 2023 diff hist +4 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 15:04, 27 September 2023 diff hist +11 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 15:00, 27 September 2023 diff hist +242 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 14:56, 27 September 2023 diff hist 0 N File:Rooftop-Treatment-System v1.PNG current
- 14:56, 27 September 2023 diff hist 0 N File:Basement-Treatment-System-v1.PNG current
- 14:55, 27 September 2023 diff hist 0 N File:Roof-Leader-Set-Up-v1.PNG current
- 14:51, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview
- 14:51, 27 September 2023 diff hist +18 Smart Blue Roof - Project Overview
- 14:50, 27 September 2023 diff hist +21 Smart Blue Roof - Project Overview →Contact Information
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Contact Information
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 2 – Modulating Control Valves
- 14:48, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 14:48, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Introduction
- 14:47, 27 September 2023 diff hist +75 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 14:45, 27 September 2023 diff hist +7 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:45, 27 September 2023 diff hist +1 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:45, 27 September 2023 diff hist +4 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:44, 27 September 2023 diff hist +3 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:44, 27 September 2023 diff hist +22 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:43, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 14:42, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 14:41, 27 September 2023 diff hist +13 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 14:41, 27 September 2023 diff hist −15 Smart Blue Roof - Project Overview →Station 2 – Modulating Control Valves
- 14:40, 27 September 2023 diff hist +178 Smart Blue Roof - Project Overview
- 14:40, 27 September 2023 diff hist −178 Smart Blue Roof - Project Overview →Introduction
- 14:39, 27 September 2023 diff hist −1 Smart Blue Roof - Project Overview →Introduction
- 14:38, 27 September 2023 diff hist −2 Smart Blue Roof - Project Overview →Introduction
- 14:38, 27 September 2023 diff hist +2 Smart Blue Roof - Project Overview →Introduction
- 14:36, 27 September 2023 diff hist +12,928 N Smart Blue Roof - Project Overview =
- 17:56, 30 September 2022 diff hist −13 Green roof construction current
- 17:54, 30 September 2022 diff hist −2 Final Certification current
- 17:54, 30 September 2022 diff hist +7 Final Certification
- 17:52, 30 September 2022 diff hist −16 Paver installation current
- 17:42, 30 September 2022 diff hist −2 Finishing grades and surface layer installation: permeable pavements
- 17:42, 30 September 2022 diff hist +1 Finishing grades and surface layer installation: permeable pavements
- 17:41, 30 September 2022 diff hist +43 Finishing grades and surface layer installation: permeable pavements
- 17:39, 30 September 2022 diff hist +22 Finishing grades and surface layer installation: vegetated LIDs →As-built surveys current
- 17:38, 30 September 2022 diff hist −1,499 Finishing grades and surface layer installation: vegetated LIDs →As-built surveys
- 17:38, 30 September 2022 diff hist −16 As-built surveys current
- 17:38, 30 September 2022 diff hist +322 As-built surveys
- 17:35, 30 September 2022 diff hist +2 Trench, chamber, and perforated pipe: Installation current
- 17:34, 30 September 2022 diff hist 0 Trench, chamber, and perforated pipe: Installation
- 17:33, 30 September 2022 diff hist 0 Trench, chamber, and perforated pipe: Installation
- 17:32, 30 September 2022 diff hist −7 Trench, chamber, and perforated pipe: Installation
- 17:31, 30 September 2022 diff hist +2 Trench, chamber, and perforated pipe: Installation
- 17:29, 30 September 2022 diff hist +406 Trench, chamber, and perforated pipe: Installation
- 17:17, 30 September 2022 diff hist +437 Trench, chamber, and perforated pipe: Installation
- 17:14, 30 September 2022 diff hist +269 Trench, chamber, and perforated pipe: Installation
- 17:10, 30 September 2022 diff hist +220 Trench, chamber, and perforated pipe: Installation
- 17:03, 30 September 2022 diff hist 0 Trench, chamber, and perforated pipe: Installation
- 17:02, 30 September 2022 diff hist −7 Trench, chamber, and perforated pipe: Installation
- 17:02, 30 September 2022 diff hist −14 Trench, chamber, and perforated pipe: Installation
- 16:59, 30 September 2022 diff hist 0 N File:Cahill infiltration.PNG current
- 16:57, 30 September 2022 diff hist 0 N File:Infiltration trench Cahill.pdf current
- 15:35, 30 September 2022 diff hist +14 Trench, chamber, and perforated pipe: Installation
- 15:35, 30 September 2022 diff hist +88 Trench, chamber, and perforated pipe: Installation
- 04:28, 29 September 2022 diff hist +30 Post-construction
- 04:27, 29 September 2022 diff hist −15 Final Certification
- 04:26, 29 September 2022 diff hist −236 Final Certification
- 04:25, 29 September 2022 diff hist +1 Final Certification
- 04:24, 29 September 2022 diff hist +327 Final Certification
- 04:18, 29 September 2022 diff hist +249 Final Certification
- 04:15, 29 September 2022 diff hist +78 Final Certification
- 03:50, 29 September 2022 diff hist +14 Final Certification
- 03:49, 29 September 2022 diff hist 0 N File:Double-ring-infiltrometer.png current
- 03:14, 29 September 2022 diff hist +66 Placement and finishing current
- 03:12, 29 September 2022 diff hist −1 Placement and finishing
- 03:03, 29 September 2022 diff hist +26 Placement and finishing
- 02:40, 29 September 2022 diff hist −1 Placement and finishing
- 02:40, 29 September 2022 diff hist +248 Placement and finishing
- 02:19, 29 September 2022 diff hist +26 Finishing grades and surface layer installation: vegetated LIDs →Permanent fencing
- 02:02, 29 September 2022 diff hist −127 Finishing grades and surface layer installation: vegetated LIDs →As-built surveys
- 02:01, 29 September 2022 diff hist +449 Finishing grades and surface layer installation: vegetated LIDs →As-built surveys
- 01:33, 29 September 2022 diff hist −6 Overflow: Installation current
- 01:17, 29 September 2022 diff hist +192 Geotextiles: Installation current
- 00:54, 29 September 2022 diff hist −6 Geotextiles: Installation
- 14:46, 22 September 2022 diff hist 0 Paver installation
- 01:40, 22 September 2022 diff hist +18 Paver installation
- 01:24, 22 September 2022 diff hist −1 Green roof construction →Key inspection points
- 01:24, 22 September 2022 diff hist −2,309 Green roof construction →Key inspection points
- 01:18, 22 September 2022 diff hist +12 Green roof construction →Key construction steps
- 01:17, 22 September 2022 diff hist +394 Green roof construction →Key construction steps
- 01:16, 22 September 2022 diff hist −257 Green roof construction →References
- 01:15, 22 September 2022 diff hist +193 Green roof construction →Component description
- 01:11, 22 September 2022 diff hist −308 Green roof construction →Key construction steps
- 01:10, 22 September 2022 diff hist +6 Green roof construction →Overview
- 01:10, 22 September 2022 diff hist +1,113 Green roof construction →Overview
- 00:21, 22 September 2022 diff hist 0 Green roof construction →Key construction steps
- 00:21, 22 September 2022 diff hist +2 Green roof construction →Key construction steps
- 00:17, 22 September 2022 diff hist +306 Green roof construction →Key construction steps
- 17:40, 13 September 2022 diff hist +185 Green roof construction →Key construction steps
- 17:38, 13 September 2022 diff hist −3,218 Green roof construction →Key construction steps
- 17:38, 13 September 2022 diff hist 0 Green roof construction →Key construction steps
- 17:38, 13 September 2022 diff hist 0 Green roof construction →Key construction steps
- 15:27, 13 September 2022 diff hist +70 Green roof construction →Key inspection points
- 15:26, 13 September 2022 diff hist +2,355 Green roof construction →Key inspection points
- 14:58, 13 September 2022 diff hist 0 Green roof construction →Key construction steps
- 14:57, 13 September 2022 diff hist −30 Green roof construction →Key construction steps
- 14:55, 13 September 2022 diff hist −23 Green roof construction →Key construction steps
- 14:44, 13 September 2022 diff hist +2 Green roof construction →Key construction steps
- 14:44, 13 September 2022 diff hist +3,366 Green roof construction →Key construction steps
- 14:41, 13 September 2022 diff hist −3,569 Green roof construction →Key construction steps Tag: Manual revert
- 14:40, 13 September 2022 diff hist +3,014 Green roof construction →Key construction steps
- 13:57, 13 September 2022 diff hist +555 Green roof construction →Key construction steps
- 13:44, 13 September 2022 diff hist −25 Green roof construction
- 13:42, 13 September 2022 diff hist −26 Green roof construction
- 13:40, 13 September 2022 diff hist 0 Green roof construction
- 13:40, 13 September 2022 diff hist +1 Green roof construction →Component description
- 13:39, 13 September 2022 diff hist −3 Green roof construction
- 13:39, 13 September 2022 diff hist +2 Green roof construction
- 13:38, 13 September 2022 diff hist +6 Green roof construction →Component description
- 13:36, 13 September 2022 diff hist 0 Green roof construction →Component description
- 13:36, 13 September 2022 diff hist 0 Green roof construction →Component description
- 13:36, 13 September 2022 diff hist −6 Green roof construction →Component description
- 13:34, 13 September 2022 diff hist 0 Green roof construction →Component description
- 13:34, 13 September 2022 diff hist −1 Green roof construction →Component description
- 13:33, 13 September 2022 diff hist +5 Green roof construction
- 13:32, 13 September 2022 diff hist +194 Green roof construction →Component description
- 03:14, 13 September 2022 diff hist +48 Green roof construction →Component description
- 03:13, 13 September 2022 diff hist 0 Green roof construction →Component description
- 03:13, 13 September 2022 diff hist +144 Green roof construction →Component description
- 13:03, 12 September 2022 diff hist +17 Green roof construction →Component description
- 12:54, 12 September 2022 diff hist 0 Green roof construction →Component description
- 12:54, 12 September 2022 diff hist +16 Green roof construction →Component description
- 12:47, 12 September 2022 diff hist +139 Green roof construction
- 12:38, 12 September 2022 diff hist +22 Green roof construction →Overview
- 12:37, 12 September 2022 diff hist +139 Green roof construction →Overview
- 03:11, 12 September 2022 diff hist +39 Green roof construction
- 03:05, 12 September 2022 diff hist +10 Green roof construction
- 03:03, 12 September 2022 diff hist +2 Green roof construction
- 03:03, 12 September 2022 diff hist +69 Green roof construction
- 02:58, 12 September 2022 diff hist +26 Green roof construction
- 02:55, 12 September 2022 diff hist +150 Green roof construction
- 23:40, 11 September 2022 diff hist 0 Green roof construction
- 23:40, 11 September 2022 diff hist 0 Green roof construction
- 21:47, 11 September 2022 diff hist +4 Green roof construction
- 21:46, 11 September 2022 diff hist +84 Green roof construction
- 15:14, 6 September 2022 diff hist +6 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 15:13, 6 September 2022 diff hist +206 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 15:07, 6 September 2022 diff hist 0 N File:Parking-lot-infiltration-chamber.JPG current
- 15:02, 6 September 2022 diff hist −129 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 14:39, 6 September 2022 diff hist +825 Sub-surface components →Chamber Installation
- 17:47, 18 August 2022 diff hist +101 Sub-surface components →Chamber Installation
- 17:33, 18 August 2022 diff hist +18 Sub-surface components →Chamber Installation
- 17:25, 18 August 2022 diff hist +15 Sub-surface components →Chamber Installation
- 17:24, 18 August 2022 diff hist +132 Sub-surface components →Chamber Installation
- 17:18, 18 August 2022 diff hist 0 Sub-surface components →Chamber Installation
- 17:18, 18 August 2022 diff hist +257 Sub-surface components →Chamber Installation
- 17:13, 18 August 2022 diff hist +115 Sub-surface components →Chamber Installation
- 16:59, 18 August 2022 diff hist −303 Sub-surface components →Chamber Installation
- 16:58, 18 August 2022 diff hist +1,733 Sub-surface components →Chamber Installation
- 16:48, 18 August 2022 diff hist 0 N File:Chamber-excavator.jpg current
- 16:46, 18 August 2022 diff hist 0 N File:Alton-Envirohood.jpg current
- 16:44, 18 August 2022 diff hist 0 N File:Scour-fabric.jpg current
- 16:43, 18 August 2022 diff hist 0 N File:ADS-manifold.jpg current
- 16:00, 18 August 2022 diff hist 0 N File:Alton-chamber.JPG current
- 15:59, 18 August 2022 diff hist 0 N File:Alton-excavator-trench.JPG current
- 15:44, 18 August 2022 diff hist +5 Sub-surface components →Permeable pavement sub-base and base course
- 15:42, 18 August 2022 diff hist +3,163 Sub-surface components →Permeable pavement sub-base and base course
- 18:44, 12 August 2022 diff hist 0 Bedding layer
- 18:43, 12 August 2022 diff hist −3 Finishing grades and surface layer installation: permeable pavements
- 18:43, 12 August 2022 diff hist +130 Finishing grades and surface layer installation: permeable pavements
- 18:42, 12 August 2022 diff hist +18 N Finishing grades and surface layer installation: permeable pavements Created page with "{{:Bedding layer}}"
- 18:33, 12 August 2022 diff hist +18 Paver installation
- 18:33, 12 August 2022 diff hist +18 Placement and finishing
- 18:32, 12 August 2022 diff hist +18 Bedding layer
- 18:15, 12 August 2022 diff hist +1 Paver installation
- 18:11, 12 August 2022 diff hist −1 Paver installation
- 18:09, 12 August 2022 diff hist +700 Paver installation
- 18:04, 12 August 2022 diff hist −1 Placement and finishing
- 18:04, 12 August 2022 diff hist 0 Placement and finishing
- 18:04, 12 August 2022 diff hist 0 Placement and finishing
- 18:03, 12 August 2022 diff hist +354 Placement and finishing
- 16:52, 12 August 2022 diff hist 0 Bedding layer
- 16:52, 12 August 2022 diff hist 0 Bedding layer
- 16:52, 12 August 2022 diff hist +104 Bedding layer
- 16:47, 12 August 2022 diff hist 0 N File:Vibratory-screed-2.JPG current
- 16:46, 12 August 2022 diff hist 0 N File:Vibratory-screed.PNG current
- 16:45, 12 August 2022 diff hist 0 N File:Concrete-roller.JPG current
- 16:10, 12 August 2022 diff hist 0 N File:Paver-placement-cut.JPG current
- 16:06, 12 August 2022 diff hist 0 N File:Paver-cutting-incorrect.JPG current
- 15:58, 12 August 2022 diff hist 0 N File:IMAX-Paved.JPG current
- 15:51, 12 August 2022 diff hist 0 N File:Paver-placement-crane.JPG current
- 15:48, 12 August 2022 diff hist 0 N File:Paver-placement-vehicle-2.JPG current
- 15:42, 12 August 2022 diff hist 0 N File:Paver-placement-vehicle.JPG current
- 15:35, 12 August 2022 diff hist 0 N File:Bedding-raking.JPG current
- 17:59, 11 August 2022 diff hist +1,641 N Paver installation Created page with "Permeable pavers have the highest load tolerance of the permeable pavement variations. It is especially important that the permeable pavers be installed correctly on the bedding material. Construction Steps: #Lay permeable pavers by hand or install whole pallets of pavers at a time with specialized equipment. #Cut pavers to fit into the edges of the infiltration area. #Fill voids between pavers with joint aggregate. #Sweep excess joint aggregate from pavement surface. #..."
- 17:58, 11 August 2022 diff hist +3,614 N Placement and finishing Created page with "The installation of pervious concrete requires the placement of ready-mix into forms. Unlike permeable pavers, pervious concrete also requires extensive curing time. Pervious concrete has the most particular installation requirements of the various permeable pavement types. It is recommended that contractors with certifications for the installation of pervious concrete, such as NRMCA certifications, are tasked with its installation. Construction Steps: #Install 10 mm ve..."
- 17:56, 11 August 2022 diff hist +1,350 N Bedding layer Created page with "The bedding layer consists of a coarse stone and provides a level medium onto which paved surfaces are installed. Note that bedding layers are required for permeable pavers but not porous concrete. Additionally, the bedding layer can function as the choker course, depending on the design. Construction Steps: #Place stone bedding material on top of compacted reservoir course. #Level aggregate to the appropriate depth, as per the design. A vibratory screed can be used to..."
- 14:46, 22 July 2022 diff hist 0 Overflow: Installation