- 13:28, 28 September 2023 diff hist −161 Smart Blue Roof - Project Overview (Summary) current
- 13:27, 28 September 2023 diff hist −161 Smart Blue Roof - Project Overview current
- 03:03, 28 September 2023 diff hist −3 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 03:03, 28 September 2023 diff hist −5 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 02:59, 28 September 2023 diff hist +48 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 02:53, 28 September 2023 diff hist +1 Smart Blue Roof - Project Overview →Station 4 – Basement Cistern and Treatment System
- 02:52, 28 September 2023 diff hist +12 Smart Blue Roof - Project Overview →Station 4 – Basement Cistern and Treatment System
- 02:51, 28 September 2023 diff hist −1 Smart Blue Roof - Project Overview →Station 4 – Basement Cistern and Treatment System
- 02:49, 28 September 2023 diff hist −266 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:47, 28 September 2023 diff hist −2 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:45, 28 September 2023 diff hist +1 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:45, 28 September 2023 diff hist −1 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:44, 28 September 2023 diff hist +3 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:42, 28 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:41, 28 September 2023 diff hist −15 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:29, 28 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Introduction
- 02:19, 28 September 2023 diff hist +130 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 02:19, 28 September 2023 diff hist +130 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 02:17, 28 September 2023 diff hist +39 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 02:08, 28 September 2023 diff hist 0 Smart Blue Roof - Project Overview (Summary) →Station 4 – Basement Cistern and Treatment System
- 02:08, 28 September 2023 diff hist 0 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 01:56, 28 September 2023 diff hist −3 Smart Blue Roof - Project Overview (Summary) →Station 4 – Basement Cistern and Treatment System
- 01:50, 28 September 2023 diff hist +2 Smart Blue Roof - Project Overview (Summary) →Station 1 – Roof Surface
- 19:57, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 4 – Basement Cistern and Treatment System
- 19:57, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 19:57, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 19:55, 27 September 2023 diff hist 0 N File:Rooftop-Treatment-System-v3.PNG current
- 19:51, 27 September 2023 diff hist 0 N File:Basement-Treatment-System-v2.PNG current
- 18:59, 27 September 2023 diff hist −15 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 18:57, 27 September 2023 diff hist +45 Smart Blue Roof - Project Overview (Summary)
- 18:56, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview (Summary)
- 18:55, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview
- 18:55, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview (Summary)
- 18:54, 27 September 2023 diff hist +88 Smart Blue Roof - Project Overview
- 18:54, 27 September 2023 diff hist +277 Smart Blue Roof - Project Overview (Summary)
- 15:56, 27 September 2023 diff hist −7 Smart Blue Roof - Project Overview (Summary) →Station 2 – Modulating Control Valves
- 15:55, 27 September 2023 diff hist −14 Smart Blue Roof - Project Overview (Summary)
- 15:54, 27 September 2023 diff hist +38 Smart Blue Roof - Project Overview (Summary)
- 15:52, 27 September 2023 diff hist +7 Smart Blue Roof - Project Overview (Summary) →Station 2 – Modulating Control Valves
- 15:45, 27 September 2023 diff hist +176 Smart Blue Roof - Project Overview (Summary) →Station 4 – Basement Cistern and Treatment System
- 15:45, 27 September 2023 diff hist +210 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 15:44, 27 September 2023 diff hist −11 Smart Blue Roof - Project Overview (Summary) →Station 2 – Modulating Control Valves
- 15:44, 27 September 2023 diff hist +262 Smart Blue Roof - Project Overview (Summary) →Station 2 – Modulating Control Valves
- 15:43, 27 September 2023 diff hist +21 Smart Blue Roof - Project Overview (Summary) →Contact Information
- 15:42, 27 September 2023 diff hist −3 Smart Blue Roof - Project Overview (Summary) →Station 3 – Third-Floor Treatment System
- 15:42, 27 September 2023 diff hist +4 Smart Blue Roof - Project Overview (Summary) →Station 4 – Base Cistern and Treatment System
- 15:42, 27 September 2023 diff hist +4 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 15:39, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview (Summary) →Station 4 – Base Cistern and Treatment System
- 15:39, 27 September 2023 diff hist +5,839 N Smart Blue Roof - Project Overview (Summary) Created page with "=='''Introduction'''== Conventional flat roofs on industrial, commercial, and institutional buildings are designed to quickly remove rainwater from their surfaces. The passive control strategy of these conventional roof assemblies provides no opportunity for rainwater reuse and contributes to downstream erosion and the potential for flooding. Credit Valley Conservation’s Smart Blue Roof (SBR) flips this idea on its head and uses an active control strategy to capture ra..."
- 15:33, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 15:33, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 15:32, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 15:32, 27 September 2023 diff hist −2 Smart Blue Roof - Project Overview
- 15:30, 27 September 2023 diff hist −1 Smart Blue Roof - Project Overview →Station 2 – Modulating Control Valves
- 15:17, 27 September 2023 diff hist 0 N File:Rooftop-Treatment-System-v2.png current
- 15:10, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview
- 15:10, 27 September 2023 diff hist +401 Smart Blue Roof - Project Overview
- 15:05, 27 September 2023 diff hist +4 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 15:04, 27 September 2023 diff hist +11 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 15:00, 27 September 2023 diff hist +242 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 14:56, 27 September 2023 diff hist 0 N File:Rooftop-Treatment-System v1.PNG current
- 14:56, 27 September 2023 diff hist 0 N File:Basement-Treatment-System-v1.PNG current
- 14:55, 27 September 2023 diff hist 0 N File:Roof-Leader-Set-Up-v1.PNG current
- 14:51, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview
- 14:51, 27 September 2023 diff hist +18 Smart Blue Roof - Project Overview
- 14:50, 27 September 2023 diff hist +21 Smart Blue Roof - Project Overview →Contact Information
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Contact Information
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 14:49, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 2 – Modulating Control Valves
- 14:48, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 1 – Roof Surface
- 14:48, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Introduction
- 14:47, 27 September 2023 diff hist +75 Smart Blue Roof - Project Overview →Station 5 – Programmable Logic Controller
- 14:45, 27 September 2023 diff hist +7 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:45, 27 September 2023 diff hist +1 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:45, 27 September 2023 diff hist +4 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:44, 27 September 2023 diff hist +3 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:44, 27 September 2023 diff hist +22 Smart Blue Roof - Project Overview →Station 4 – Base Cistern and Treatment System
- 14:43, 27 September 2023 diff hist +6 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 14:42, 27 September 2023 diff hist 0 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 14:41, 27 September 2023 diff hist +13 Smart Blue Roof - Project Overview →Station 3 – Third-Floor Treatment System
- 14:41, 27 September 2023 diff hist −15 Smart Blue Roof - Project Overview →Station 2 – Modulating Control Valves
- 14:40, 27 September 2023 diff hist +178 Smart Blue Roof - Project Overview
- 14:40, 27 September 2023 diff hist −178 Smart Blue Roof - Project Overview →Introduction
- 14:39, 27 September 2023 diff hist −1 Smart Blue Roof - Project Overview →Introduction
- 14:38, 27 September 2023 diff hist −2 Smart Blue Roof - Project Overview →Introduction
- 14:38, 27 September 2023 diff hist +2 Smart Blue Roof - Project Overview →Introduction
- 14:36, 27 September 2023 diff hist +12,928 N Smart Blue Roof - Project Overview =
- 17:56, 30 September 2022 diff hist −13 Green roof construction current
- 17:54, 30 September 2022 diff hist −2 Final Certification current
- 17:54, 30 September 2022 diff hist +7 Final Certification
- 17:52, 30 September 2022 diff hist −16 Paver installation current
- 17:42, 30 September 2022 diff hist −2 Finishing grades and surface layer installation: permeable pavements
- 17:42, 30 September 2022 diff hist +1 Finishing grades and surface layer installation: permeable pavements
- 17:41, 30 September 2022 diff hist +43 Finishing grades and surface layer installation: permeable pavements
- 17:39, 30 September 2022 diff hist +22 Finishing grades and surface layer installation: vegetated LIDs →As-built surveys current
- 17:38, 30 September 2022 diff hist −1,499 Finishing grades and surface layer installation: vegetated LIDs →As-built surveys
- 17:38, 30 September 2022 diff hist −16 As-built surveys current
- 17:38, 30 September 2022 diff hist +322 As-built surveys
- 17:35, 30 September 2022 diff hist +2 Trench, chamber, and perforated pipe: Installation current
- 17:34, 30 September 2022 diff hist 0 Trench, chamber, and perforated pipe: Installation
- 17:33, 30 September 2022 diff hist 0 Trench, chamber, and perforated pipe: Installation
- 17:32, 30 September 2022 diff hist −7 Trench, chamber, and perforated pipe: Installation
- 17:31, 30 September 2022 diff hist +2 Trench, chamber, and perforated pipe: Installation
- 17:29, 30 September 2022 diff hist +406 Trench, chamber, and perforated pipe: Installation
- 17:17, 30 September 2022 diff hist +437 Trench, chamber, and perforated pipe: Installation
- 17:14, 30 September 2022 diff hist +269 Trench, chamber, and perforated pipe: Installation
- 17:10, 30 September 2022 diff hist +220 Trench, chamber, and perforated pipe: Installation
- 17:03, 30 September 2022 diff hist 0 Trench, chamber, and perforated pipe: Installation
- 17:02, 30 September 2022 diff hist −7 Trench, chamber, and perforated pipe: Installation
- 17:02, 30 September 2022 diff hist −14 Trench, chamber, and perforated pipe: Installation
- 16:59, 30 September 2022 diff hist 0 N File:Cahill infiltration.PNG current
- 16:57, 30 September 2022 diff hist 0 N File:Infiltration trench Cahill.pdf current
- 15:35, 30 September 2022 diff hist +14 Trench, chamber, and perforated pipe: Installation
- 15:35, 30 September 2022 diff hist +88 Trench, chamber, and perforated pipe: Installation
- 04:28, 29 September 2022 diff hist +30 Post-construction
- 04:27, 29 September 2022 diff hist −15 Final Certification
- 04:26, 29 September 2022 diff hist −236 Final Certification
- 04:25, 29 September 2022 diff hist +1 Final Certification
- 04:24, 29 September 2022 diff hist +327 Final Certification
- 04:18, 29 September 2022 diff hist +249 Final Certification
- 04:15, 29 September 2022 diff hist +78 Final Certification
- 03:50, 29 September 2022 diff hist +14 Final Certification
- 03:49, 29 September 2022 diff hist 0 N File:Double-ring-infiltrometer.png current
- 03:14, 29 September 2022 diff hist +66 Placement and finishing current
- 03:12, 29 September 2022 diff hist −1 Placement and finishing
- 03:03, 29 September 2022 diff hist +26 Placement and finishing
- 02:40, 29 September 2022 diff hist −1 Placement and finishing
- 02:40, 29 September 2022 diff hist +248 Placement and finishing
- 02:19, 29 September 2022 diff hist +26 Finishing grades and surface layer installation: vegetated LIDs →Permanent fencing
- 02:02, 29 September 2022 diff hist −127 Finishing grades and surface layer installation: vegetated LIDs →As-built surveys
- 02:01, 29 September 2022 diff hist +449 Finishing grades and surface layer installation: vegetated LIDs →As-built surveys
- 01:33, 29 September 2022 diff hist −6 Overflow: Installation current
- 01:17, 29 September 2022 diff hist +192 Geotextiles: Installation current
- 00:54, 29 September 2022 diff hist −6 Geotextiles: Installation
- 14:46, 22 September 2022 diff hist 0 Paver installation
- 01:40, 22 September 2022 diff hist +18 Paver installation
- 01:24, 22 September 2022 diff hist −1 Green roof construction →Key inspection points
- 01:24, 22 September 2022 diff hist −2,309 Green roof construction →Key inspection points
- 01:18, 22 September 2022 diff hist +12 Green roof construction →Key construction steps
- 01:17, 22 September 2022 diff hist +394 Green roof construction →Key construction steps
- 01:16, 22 September 2022 diff hist −257 Green roof construction →References
- 01:15, 22 September 2022 diff hist +193 Green roof construction →Component description
- 01:11, 22 September 2022 diff hist −308 Green roof construction →Key construction steps
- 01:10, 22 September 2022 diff hist +6 Green roof construction →Overview
- 01:10, 22 September 2022 diff hist +1,113 Green roof construction →Overview
- 00:21, 22 September 2022 diff hist 0 Green roof construction →Key construction steps
- 00:21, 22 September 2022 diff hist +2 Green roof construction →Key construction steps
- 00:17, 22 September 2022 diff hist +306 Green roof construction →Key construction steps
- 17:40, 13 September 2022 diff hist +185 Green roof construction →Key construction steps
- 17:38, 13 September 2022 diff hist −3,218 Green roof construction →Key construction steps
- 17:38, 13 September 2022 diff hist 0 Green roof construction →Key construction steps
- 17:38, 13 September 2022 diff hist 0 Green roof construction →Key construction steps
- 15:27, 13 September 2022 diff hist +70 Green roof construction →Key inspection points
- 15:26, 13 September 2022 diff hist +2,355 Green roof construction →Key inspection points
- 14:58, 13 September 2022 diff hist 0 Green roof construction →Key construction steps
- 14:57, 13 September 2022 diff hist −30 Green roof construction →Key construction steps
- 14:55, 13 September 2022 diff hist −23 Green roof construction →Key construction steps
- 14:44, 13 September 2022 diff hist +2 Green roof construction →Key construction steps
- 14:44, 13 September 2022 diff hist +3,366 Green roof construction →Key construction steps
- 14:41, 13 September 2022 diff hist −3,569 Green roof construction →Key construction steps Tag: Manual revert
- 14:40, 13 September 2022 diff hist +3,014 Green roof construction →Key construction steps
- 13:57, 13 September 2022 diff hist +555 Green roof construction →Key construction steps
- 13:44, 13 September 2022 diff hist −25 Green roof construction
- 13:42, 13 September 2022 diff hist −26 Green roof construction
- 13:40, 13 September 2022 diff hist 0 Green roof construction
- 13:40, 13 September 2022 diff hist +1 Green roof construction →Component description
- 13:39, 13 September 2022 diff hist −3 Green roof construction
- 13:39, 13 September 2022 diff hist +2 Green roof construction
- 13:38, 13 September 2022 diff hist +6 Green roof construction →Component description
- 13:36, 13 September 2022 diff hist 0 Green roof construction →Component description
- 13:36, 13 September 2022 diff hist 0 Green roof construction →Component description
- 13:36, 13 September 2022 diff hist −6 Green roof construction →Component description
- 13:34, 13 September 2022 diff hist 0 Green roof construction →Component description
- 13:34, 13 September 2022 diff hist −1 Green roof construction →Component description
- 13:33, 13 September 2022 diff hist +5 Green roof construction
- 13:32, 13 September 2022 diff hist +194 Green roof construction →Component description
- 03:14, 13 September 2022 diff hist +48 Green roof construction →Component description
- 03:13, 13 September 2022 diff hist 0 Green roof construction →Component description
- 03:13, 13 September 2022 diff hist +144 Green roof construction →Component description
- 13:03, 12 September 2022 diff hist +17 Green roof construction →Component description
- 12:54, 12 September 2022 diff hist 0 Green roof construction →Component description
- 12:54, 12 September 2022 diff hist +16 Green roof construction →Component description
- 12:47, 12 September 2022 diff hist +139 Green roof construction
- 12:38, 12 September 2022 diff hist +22 Green roof construction →Overview
- 12:37, 12 September 2022 diff hist +139 Green roof construction →Overview
- 03:11, 12 September 2022 diff hist +39 Green roof construction
- 03:05, 12 September 2022 diff hist +10 Green roof construction
- 03:03, 12 September 2022 diff hist +2 Green roof construction
- 03:03, 12 September 2022 diff hist +69 Green roof construction
- 02:58, 12 September 2022 diff hist +26 Green roof construction
- 02:55, 12 September 2022 diff hist +150 Green roof construction
- 23:40, 11 September 2022 diff hist 0 Green roof construction
- 23:40, 11 September 2022 diff hist 0 Green roof construction
- 21:47, 11 September 2022 diff hist +4 Green roof construction
- 21:46, 11 September 2022 diff hist +84 Green roof construction
- 15:14, 6 September 2022 diff hist +6 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 15:13, 6 September 2022 diff hist +206 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 15:07, 6 September 2022 diff hist 0 N File:Parking-lot-infiltration-chamber.JPG current
- 15:02, 6 September 2022 diff hist −129 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 14:39, 6 September 2022 diff hist +825 Sub-surface components →Chamber Installation
- 17:47, 18 August 2022 diff hist +101 Sub-surface components →Chamber Installation
- 17:33, 18 August 2022 diff hist +18 Sub-surface components →Chamber Installation
- 17:25, 18 August 2022 diff hist +15 Sub-surface components →Chamber Installation
- 17:24, 18 August 2022 diff hist +132 Sub-surface components →Chamber Installation
- 17:18, 18 August 2022 diff hist 0 Sub-surface components →Chamber Installation
- 17:18, 18 August 2022 diff hist +257 Sub-surface components →Chamber Installation
- 17:13, 18 August 2022 diff hist +115 Sub-surface components →Chamber Installation
- 16:59, 18 August 2022 diff hist −303 Sub-surface components →Chamber Installation
- 16:58, 18 August 2022 diff hist +1,733 Sub-surface components →Chamber Installation
- 16:48, 18 August 2022 diff hist 0 N File:Chamber-excavator.jpg current
- 16:46, 18 August 2022 diff hist 0 N File:Alton-Envirohood.jpg current
- 16:44, 18 August 2022 diff hist 0 N File:Scour-fabric.jpg current
- 16:43, 18 August 2022 diff hist 0 N File:ADS-manifold.jpg current
- 16:00, 18 August 2022 diff hist 0 N File:Alton-chamber.JPG current
- 15:59, 18 August 2022 diff hist 0 N File:Alton-excavator-trench.JPG current
- 15:44, 18 August 2022 diff hist +5 Sub-surface components →Permeable pavement sub-base and base course
- 15:42, 18 August 2022 diff hist +3,163 Sub-surface components →Permeable pavement sub-base and base course
- 18:44, 12 August 2022 diff hist 0 Bedding layer
- 18:43, 12 August 2022 diff hist −3 Finishing grades and surface layer installation: permeable pavements
- 18:43, 12 August 2022 diff hist +130 Finishing grades and surface layer installation: permeable pavements
- 18:42, 12 August 2022 diff hist +18 N Finishing grades and surface layer installation: permeable pavements Created page with "{{:Bedding layer}}"
- 18:33, 12 August 2022 diff hist +18 Paver installation
- 18:33, 12 August 2022 diff hist +18 Placement and finishing
- 18:32, 12 August 2022 diff hist +18 Bedding layer
- 18:15, 12 August 2022 diff hist +1 Paver installation
- 18:11, 12 August 2022 diff hist −1 Paver installation
- 18:09, 12 August 2022 diff hist +700 Paver installation
- 18:04, 12 August 2022 diff hist −1 Placement and finishing
- 18:04, 12 August 2022 diff hist 0 Placement and finishing
- 18:04, 12 August 2022 diff hist 0 Placement and finishing
- 18:03, 12 August 2022 diff hist +354 Placement and finishing
- 16:52, 12 August 2022 diff hist 0 Bedding layer
- 16:52, 12 August 2022 diff hist 0 Bedding layer
- 16:52, 12 August 2022 diff hist +104 Bedding layer
- 16:47, 12 August 2022 diff hist 0 N File:Vibratory-screed-2.JPG current
- 16:46, 12 August 2022 diff hist 0 N File:Vibratory-screed.PNG current
- 16:45, 12 August 2022 diff hist 0 N File:Concrete-roller.JPG current
- 16:10, 12 August 2022 diff hist 0 N File:Paver-placement-cut.JPG current
- 16:06, 12 August 2022 diff hist 0 N File:Paver-cutting-incorrect.JPG current
- 15:58, 12 August 2022 diff hist 0 N File:IMAX-Paved.JPG current
- 15:51, 12 August 2022 diff hist 0 N File:Paver-placement-crane.JPG current
- 15:48, 12 August 2022 diff hist 0 N File:Paver-placement-vehicle-2.JPG current
- 15:42, 12 August 2022 diff hist 0 N File:Paver-placement-vehicle.JPG current
- 15:35, 12 August 2022 diff hist 0 N File:Bedding-raking.JPG current
- 17:59, 11 August 2022 diff hist +1,641 N Paver installation Created page with "Permeable pavers have the highest load tolerance of the permeable pavement variations. It is especially important that the permeable pavers be installed correctly on the bedding material. Construction Steps: #Lay permeable pavers by hand or install whole pallets of pavers at a time with specialized equipment. #Cut pavers to fit into the edges of the infiltration area. #Fill voids between pavers with joint aggregate. #Sweep excess joint aggregate from pavement surface. #..."
- 17:58, 11 August 2022 diff hist +3,614 N Placement and finishing Created page with "The installation of pervious concrete requires the placement of ready-mix into forms. Unlike permeable pavers, pervious concrete also requires extensive curing time. Pervious concrete has the most particular installation requirements of the various permeable pavement types. It is recommended that contractors with certifications for the installation of pervious concrete, such as NRMCA certifications, are tasked with its installation. Construction Steps: #Install 10 mm ve..."
- 17:56, 11 August 2022 diff hist +1,350 N Bedding layer Created page with "The bedding layer consists of a coarse stone and provides a level medium onto which paved surfaces are installed. Note that bedding layers are required for permeable pavers but not porous concrete. Additionally, the bedding layer can function as the choker course, depending on the design. Construction Steps: #Place stone bedding material on top of compacted reservoir course. #Level aggregate to the appropriate depth, as per the design. A vibratory screed can be used to..."
- 14:46, 22 July 2022 diff hist 0 Overflow: Installation
- 14:46, 22 July 2022 diff hist −5 As-built surveys
- 14:29, 22 July 2022 diff hist +24 Bioretention: Construction →Finishing Grades: Inlet, Outlet, Biomedia, Plants
- 14:28, 22 July 2022 diff hist −23 Bioretention: Construction →Address Deficiencies and Assumption Protocols
- 14:26, 22 July 2022 diff hist −6 Bioretention: Construction →Backfill Granular and Pipes (SPC)
- 14:26, 22 July 2022 diff hist −5 Bioretention: Construction →Excavation and mass grading (KM)
- 14:25, 22 July 2022 diff hist 0 Final Certification
- 14:24, 22 July 2022 diff hist 0 Addressing deficiencies
- 14:24, 22 July 2022 diff hist +16 Permanent fencing
- 14:24, 22 July 2022 diff hist +16 As-built surveys
- 14:23, 22 July 2022 diff hist 0 Monitoring wells: Installation
- 14:22, 22 July 2022 diff hist 0 Overflow: Installation
- 14:22, 22 July 2022 diff hist 0 Underdrains: Installation
- 14:21, 22 July 2022 diff hist +38 Impermeable liners: Installation
- 14:20, 22 July 2022 diff hist 0 Geotextiles: Installation
- 14:17, 22 July 2022 diff hist +17 Final Certification
- 14:17, 22 July 2022 diff hist +17 Addressing deficiencies
- 14:16, 22 July 2022 diff hist +38 Monitoring wells: Installation
- 14:15, 22 July 2022 diff hist +38 Overflow: Installation
- 14:14, 22 July 2022 diff hist +38 Underdrains: Installation
- 14:13, 22 July 2022 diff hist +38 Geogrids: Installation current
- 13:49, 22 July 2022 diff hist +38 Geotextiles: Installation
- 13:35, 22 July 2022 diff hist −5 Bioretention: Construction →Finishing Grades: Inlet, Outlet, Biomedia, Plants (JC)
- 13:35, 22 July 2022 diff hist −5 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:34, 22 July 2022 diff hist −5 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 15:11, 21 July 2022 diff hist −4 Final Certification
- 15:11, 21 July 2022 diff hist +2 Final Certification
- 15:11, 21 July 2022 diff hist +4 Final Certification
- 15:10, 21 July 2022 diff hist +16 Final Certification
- 15:10, 21 July 2022 diff hist +21 Final Certification
- 15:06, 21 July 2022 diff hist +141 Final Certification
- 14:57, 21 July 2022 diff hist −25 Final Certification
- 14:56, 21 July 2022 diff hist 0 Final Certification
- 14:52, 21 July 2022 diff hist −3 Final Certification
- 14:52, 21 July 2022 diff hist −16 Final Certification
- 14:51, 21 July 2022 diff hist −3,546 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 14:47, 21 July 2022 diff hist +1 Bioretention: Construction →Finishing Grades: Inlet, Outlet, Biomedia, Plants (JC)
- 14:47, 21 July 2022 diff hist −1,032 Bioretention: Construction →Finishing Grades: Inlet, Outlet, Biomedia, Plants (JC)
- 14:44, 21 July 2022 diff hist −7,156 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:39, 21 July 2022 diff hist −1 Final Certification
- 14:38, 21 July 2022 diff hist +135 Final Certification
- 14:37, 21 July 2022 diff hist −2 Final Certification
- 14:37, 21 July 2022 diff hist +16 Final Certification
- 14:36, 21 July 2022 diff hist +175 Final Certification
- 14:28, 21 July 2022 diff hist −1 As-built surveys
- 14:27, 21 July 2022 diff hist −2 As-built surveys
- 14:27, 21 July 2022 diff hist 0 As-built surveys
- 14:27, 21 July 2022 diff hist +4 As-built surveys
- 14:26, 21 July 2022 diff hist +142 As-built surveys
- 14:24, 21 July 2022 diff hist −20 As-built surveys
- 14:24, 21 July 2022 diff hist −10 Overflow: Installation
- 14:23, 21 July 2022 diff hist −28 Monitoring wells: Installation
- 14:22, 21 July 2022 diff hist −20 Impermeable liners: Installation
- 14:21, 21 July 2022 diff hist −32 Underdrains: Installation
- 14:20, 21 July 2022 diff hist −4 Geogrids: Installation
- 14:20, 21 July 2022 diff hist −28 Geotextiles: Installation
- 02:15, 21 July 2022 diff hist +252 N Addressing deficiencies Created page with "====Addressing deficiencies==== Prior to passing responsibility to the landowner, contractors must ensure that any deficiencies in the LID feature’s construction are addressed. Keep in-mind what mistakes must be avoided during each construction task."
- 01:53, 21 July 2022 diff hist −1 Permanent fencing
- 01:53, 21 July 2022 diff hist 0 Permanent fencing
- 01:53, 21 July 2022 diff hist +23 Permanent fencing
- 01:51, 21 July 2022 diff hist +25 As-built surveys
- 01:50, 21 July 2022 diff hist +17 As-built surveys
- 01:44, 21 July 2022 diff hist +18 Overflow: Installation
- 01:44, 21 July 2022 diff hist +9 Overflow: Installation
- 01:40, 21 July 2022 diff hist +37 Monitoring wells: Installation
- 01:37, 21 July 2022 diff hist +47 Monitoring wells: Installation
- 01:25, 21 July 2022 diff hist +45 Impermeable liners: Installation
- 01:23, 21 July 2022 diff hist +52 Underdrains: Installation
- 01:17, 21 July 2022 diff hist +17 Geogrids: Installation
- 01:15, 21 July 2022 diff hist +52 Geotextiles: Installation
- 18:50, 20 July 2022 diff hist +8 Impermeable liners: Installation
- 18:43, 20 July 2022 diff hist −73 Impermeable liners: Installation
- 18:42, 20 July 2022 diff hist +12 Impermeable liners: Installation
- 18:34, 20 July 2022 diff hist +46 Underdrains: Installation
- 18:30, 20 July 2022 diff hist +4 Underdrains: Installation
- 18:25, 20 July 2022 diff hist +78 Geogrids: Installation
- 18:25, 20 July 2022 diff hist −103 Geotextiles: Installation
- 18:19, 20 July 2022 diff hist +11 Geotextiles: Installation
- 18:15, 20 July 2022 diff hist +39 N Installation of underdrains JamesCowan moved page Installation of underdrains to Underdrains: Installation current Tag: New redirect
- 18:15, 20 July 2022 diff hist 0 m Underdrains: Installation JamesCowan moved page Installation of underdrains to Underdrains: Installation
- 18:15, 20 July 2022 diff hist +46 N Installation of impermeable liners JamesCowan moved page Installation of impermeable liners to Impermeable liners: Installation current Tag: New redirect
- 18:15, 20 July 2022 diff hist 0 m Impermeable liners: Installation JamesCowan moved page Installation of impermeable liners to Impermeable liners: Installation
- 18:14, 20 July 2022 diff hist +36 N Installation of geogrids JamesCowan moved page Installation of geogrids to Geogrids: Installation current Tag: New redirect
- 18:14, 20 July 2022 diff hist 0 m Geogrids: Installation JamesCowan moved page Installation of geogrids to Geogrids: Installation
- 18:11, 20 July 2022 diff hist +39 N Installation of geotextiles JamesCowan moved page Installation of geotextiles to Geotextiles: Installation current Tag: New redirect
- 18:11, 20 July 2022 diff hist 0 m Geotextiles: Installation JamesCowan moved page Installation of geotextiles to Geotextiles: Installation
- 15:17, 20 July 2022 diff hist 0 Final Certification
- 15:16, 20 July 2022 diff hist +70 Final Certification
- 15:00, 20 July 2022 diff hist +205 Final Certification
- 14:56, 20 July 2022 diff hist 0 N File:Flood-test-permeable-pavers.jpg current
- 14:54, 20 July 2022 diff hist 0 N File:Flood-test-bioretention.jpg current
- 14:07, 20 July 2022 diff hist +32 Final Certification
- 14:06, 20 July 2022 diff hist +2,972 N Final Certification Created page with "Final inspection requirements are in-place to ensure that a final site-wide inspection is performed and allow for mitigation to occur before the contractor is relieved of responsibility. Final certifications are performed by knowledgeable personnel, such as the design engineer, who are qualified to ensure that LID features are operating as intended. This stage is critically important, as it is the last opportunity for issues to be resolved before the property owner assum..."
- 13:34, 20 July 2022 diff hist +6 Permanent fencing Tag: Manual revert
- 13:33, 20 July 2022 diff hist −5 Permanent fencing
- 13:33, 20 July 2022 diff hist −1 Permanent fencing
- 13:31, 20 July 2022 diff hist +97 Permanent fencing
- 13:29, 20 July 2022 diff hist 0 N File:Permanent-fencing.jpg current
- 13:25, 20 July 2022 diff hist +343 N Permanent fencing Created page with "Permanent Fencing Delineating features with permanent fencing can eliminate tripping and falling hazards and protect soil media and plantings. Construction Steps: #Securely install fencing around the perimeter of the feature Inspection Points: *Fencing size and material matches design *Fencing is installed in correct location as per design"
- 20:08, 19 July 2022 diff hist +5 As-built surveys
- 20:07, 19 July 2022 diff hist +5 As-built surveys
- 20:04, 19 July 2022 diff hist +4 As-built surveys
- 20:03, 19 July 2022 diff hist +12 As-built surveys
- 20:02, 19 July 2022 diff hist +1,030 N As-built surveys Created page with "Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion of a post-construction as-built survey is a standard operating procedure for engineering projects that captures any changes made to the feature’s design during construction.<sb> Survey Steps: #Use the same datum as the pre-engineering survey #If a pre-engineering survey is not available, use a ref..."
- 19:47, 19 July 2022 diff hist +3 Overflow: Installation
- 19:47, 19 July 2022 diff hist +28 Overflow: Installation
- 19:46, 19 July 2022 diff hist +262 Overflow: Installation
- 19:18, 19 July 2022 diff hist 0 N File:Overflow-pipe-install.jpg current
- 19:16, 19 July 2022 diff hist 0 N File:Overflow-plastic-cap.jpg current
- 18:59, 19 July 2022 diff hist +1,118 N Overflow: Installation Created page with "Overflows are features of inline facilities and convey larger storm events out of the LID feature. Construction Steps: #Connect the overflow drain to the underdrain #Install overflow pit to grade at the location specified in the contract documents #Fit a metal, domed grate to the overflow Key Inspection Points: *Overflow drain matches design specifications *Overflow pit is positioned at the maximum water surface elevation of the practice, as per the cont..."
- 18:50, 19 July 2022 diff hist +4 Geotextiles: Installation
- 18:49, 19 July 2022 diff hist +4 Monitoring wells: Installation
- 18:49, 19 July 2022 diff hist +95 Monitoring wells: Installation
- 18:46, 19 July 2022 diff hist 0 N File:Monitoring-well-subgrade.jpg current
- 18:40, 19 July 2022 diff hist +971 N Monitoring wells: Installation Created page with "Monitoring wells allow for measurement of water levels in the sub-surface components of LID practices. They are important for sampling procedures and ensuring that the LID feature are performing as intended.<br> Construction Steps:<br> #Install a cap stand at the required elevation to anchor the monitoring well. #Wrap the perforated pipe with a geotextile sock (to prevent migration of soil into the well). #Anchor the perforated pipe to the bottom of the LID feature. #In..."
- 18:16, 19 July 2022 diff hist +14 Impermeable liners: Installation
- 18:05, 19 July 2022 diff hist 0 Impermeable liners: Installation
- 18:05, 19 July 2022 diff hist +353 Impermeable liners: Installation
- 17:55, 19 July 2022 diff hist 0 N File:Bentonite-clay-liner.jpg current
- 17:51, 19 July 2022 diff hist 0 N File:Liner-roadside.jpg current
- 15:19, 19 July 2022 diff hist +1,612 N Impermeable liners: Installation Created page with "Impermeable liners can be applied when LID features are not intended to infiltrate runoff into the underlying soil. They protect building foundations or other subsurface infrastructure. They also prevent infiltration through contaminated soils. Where building foundations next to the LID feature are not waterproofed, liners can be used to protect adjacent infrastructure.<br> Construction Steps:<br> #Compact 30 – 50 mm of sand over the soil onto which the membrane will..."
- 15:15, 19 July 2022 diff hist +32 Underdrains: Installation
- 15:14, 19 July 2022 diff hist +4 Geotextiles: Installation
- 15:13, 19 July 2022 diff hist 0 Underdrains: Installation
- 15:12, 19 July 2022 diff hist +227 Underdrains: Installation
- 15:04, 19 July 2022 diff hist 0 N File:Underdrain-subgrade.jpg current
- 14:58, 19 July 2022 diff hist 0 N File:Underdrain-with-risers.jpg current
- 13:47, 19 July 2022 diff hist −40 Underdrains: Installation
- 13:46, 19 July 2022 diff hist +1,836 N Underdrains: Installation Created page with "Underdrains Underdrains are perforated pipes that collect subsurface water and convey water out of an LID facility once it reaches capacity. Their design is determined by the drainage requirements of the feature. Construction Steps: 1. Install the underdrain to grade with a consistent slope of 0.5% to 1.0% 2. Connect overflow risers with single-elbowed ‘y’ connections or 45° elbows 3. Situate maintenance risers where siltation is expected in drain lines (such as a..."
- 04:51, 19 July 2022 diff hist +601 N Geogrids: Installation Created page with "Where structural loads are anticipated or underlying soil is particularly soft, geogrid can be applied in conjunction with geotextile. Geogrid is a rigid geosynthetic material that can be laid on sub-grade to reinforce softer soils and provide a more even distribution of loads across the sub-grade materials.<br> <gallery mode="packed" widths=300px heights=300px> geogrid-beside.jpg | Geogrid rolled out prior to installation. geogrid-silvacells.jpg | Geogrid wrapped aroun..."
- 04:51, 19 July 2022 diff hist −603 Geotextiles: Installation
- 04:46, 19 July 2022 diff hist +292 Geotextiles: Installation
- 04:43, 19 July 2022 diff hist +2 Geotextiles: Installation
- 04:43, 19 July 2022 diff hist +19 Geotextiles: Installation
- 04:39, 19 July 2022 diff hist +254 Geotextiles: Installation
- 04:28, 19 July 2022 diff hist +8 Geotextiles: Installation
- 04:21, 19 July 2022 diff hist 0 Geotextiles: Installation
- 04:20, 19 July 2022 diff hist 0 Geotextiles: Installation
- 04:20, 19 July 2022 diff hist +4 Geotextiles: Installation
- 04:19, 19 July 2022 diff hist +4 Geotextiles: Installation
- 04:19, 19 July 2022 diff hist 0 Geotextiles: Installation
- 04:17, 19 July 2022 diff hist +268 Geotextiles: Installation
- 04:10, 19 July 2022 diff hist 0 N File:Geotextile-RS380I.jpg current
- 04:05, 19 July 2022 diff hist 0 N File:Geogrid-silvacells.jpg current
- 04:00, 19 July 2022 diff hist 0 N File:Geogrid-beside.jpg current
- 03:52, 19 July 2022 diff hist 0 N File:Geotextile-backfill-underdrain.jpg current
- 03:44, 19 July 2022 diff hist 0 N File:Geotextile-facility-side.jpg current
- 18:27, 18 July 2022 diff hist −22 Geotextiles: Installation
- 18:27, 18 July 2022 diff hist +36 Geotextiles: Installation
- 18:20, 18 July 2022 diff hist +2,359 N Geotextiles: Installation Created page with "Geotextiles Geotextiles are filter fabrics that can be installed to separate dissimilar soils and prevent the migration of materials. Geotextiles are recommended for installation at the bottom and side limits of the LID feature and should be implemented at the discretion of the engineer. Construction Steps: #Roll out fabric on the flattened sub-grade surface #Provide a minimum overlap of 300 mm between adjacent lengths of geotextile. If the manufacturer specifies a grea..."
- 16:01, 9 June 2022 diff hist +18 Bioretention: Construction →Backfill Granular and Pipes (SPC)
- 16:00, 9 June 2022 diff hist +89 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 15:57, 9 June 2022 diff hist 0 N File:Impermeable-liner-along-road.jpg current
- 15:57, 9 June 2022 diff hist +166 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:43, 9 June 2022 diff hist 0 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:42, 9 June 2022 diff hist −1 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:42, 9 June 2022 diff hist +1 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:41, 9 June 2022 diff hist +123 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:38, 9 June 2022 diff hist 0 N File:Geotextile-with-excess-and-granular.jpg current
- 14:34, 9 June 2022 diff hist −136 File:Geotextile-with-excess-and-gravel.JPG →Summary current Tag: Blanking
- 14:33, 9 June 2022 diff hist 0 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:32, 9 June 2022 diff hist +50 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:29, 9 June 2022 diff hist +136 N File:Geotextile-with-excess-and-gravel.JPG Geotextile with excess material draped over the edge of the LID facility. Backfill with granular material is taking place.
- 15:13, 31 May 2022 diff hist +1 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 15:11, 31 May 2022 diff hist −228 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 15:09, 31 May 2022 diff hist +3 Bioretention: Construction →Finishing Grades: Inlet, Outlet, Biomedia, Plants (JC)
- 15:07, 31 May 2022 diff hist 0 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 15:01, 31 May 2022 diff hist +28 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 13:54, 31 May 2022 diff hist +379 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:54, 31 May 2022 diff hist −2 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:52, 31 May 2022 diff hist +4 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:52, 31 May 2022 diff hist +16 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:51, 31 May 2022 diff hist +3,348 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:47, 31 May 2022 diff hist +1,025 Bioretention: Construction →Finishing Grades: Inlet, Outlet, Biomedia, Plants (JC)
- 19:47, 30 May 2022 diff hist +1,848 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:43, 30 May 2022 diff hist +3,043 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:39, 30 May 2022 diff hist +5 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:39, 30 May 2022 diff hist +1 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:38, 30 May 2022 diff hist −16 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:37, 30 May 2022 diff hist +11 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:36, 30 May 2022 diff hist +1,693 Bioretention: Construction →Backfill Granular and Pipes (JC)